St Margaret’s United Reformed Church is in Finchley. The project consisted of two separate contracts both carried out by GreenLight.
The first contact consists of the internal alterations including the construction of a new mezzanine floor to the existing church building. Additional works included the installation of a new boiler and distribution boards.
GreenLight completed the redesign and installation of brand new LED lighting as well as a complete AV package. A new fire alarm system was introduced to bring the church up to regulations. The Church was completed with underfloor heating and installation of new ductwork and dampers for air circulation into new extension loft space.
The redesign of the church included a new back extension that was fit-out with new kitchens and bathrooms. The extension also including a groundskeepers apartment.