Premier League Sports Facility, London

About GreenLight Services

The current Matchday Safety Control Room has a single source power supply and it has been recognised that should a failure of this occur during a match, Staff would not be in a position to fully manage the safety of those attending until power is restored.

GreenLight was tasked to add resilience to the power supply infrastructure by installing a secondary source from an existing generator located elsewhere in the stadium.

The works included installing Changeover switch panels, New Distribution boards and long cable runs through the stadium itself all with no disruption to matchday and office activities.