Conducting M&E Validation Reports?
To manage risk effectively as possible, a decent validation reports of a building services need to be performed as early as possible in the project. However, any problems identified can be incorporated into the specification early on. For construction projects, this will be at pre-contract stage after initial conception. Whenever an occupant is seeking to occupy a space, it is recommended to carry out inspections before signing any lease agreements.
This is essential to ensure everything is performed in accordance with the building design criteria. This can be particularly important if you are taking on space that will require extensive modification to the existing services.
The purpose of this can save you costly mistakes and potential disputes, which are sadly all too common in the M&E industry