The Process Commercial Fit Out Electrical and Mechanical

Our diverse team of specialist managers and operatives can deliver projects of various size and complexity. With an engineering background and experience in the execution of bespoke installations, we can deliver services from day to day facility management to complex multi skilled projects.

1.

Design Process

This stage can be the most important to ensure the execution of the works is carried out within the program allowance. Good design would involve several meetings to discuss the full design and coordination of the works. 

2.

Validations

Any design can look great on paper, but the most important thing is to ensure the design works in practice.  

Validations are carried out to check existing structures, layout, M&E systems to validate the current design can work. 

3.

Site set-up 

Preparation of the site for works includes: 

  • Health and Safety Assessment 
  • Notifying relevant authorities where applicable 
  • Fire precautions 
  • Welfare facilities 
  • Protection of the existing building or elements not being altered 

4.

Demolition and Strip-out 

This could involve the use of mechanical equipment, dust extraction, and out-of-hours working. Waste recycling and disposal will be considered as will accessibility for waste disposal solutions, especially for inner-city locations where restrictions may apply. 

If the removal or containment of asbestos is involved, the timeline will have to allow for specialist handling. 

5.

First fix and Build 

Once the site has been prepared for installation the first fix teams will commence on site to carry out the first fix of all the required services.

6.

Second fix and Finishes 

As the completion of first fix services are complete, the final installation of all accessories, lighting, doors, floors, ceilings, kitchens, toilets etc. will be completed.

7.

Furniture, fixtures, and equipment (FF&E) 

Office furniture installation 
for your new workspace which is an important comfort and safety consideration, as well as a reflection of your company brand. 

Installing any acoustic solutions as well as wall and glass graphics.

8.

Full Clean

Final clean to prepare the space for presentation to the client.

9.

Handover

The handover process will include a full demonstration to all parties for general and specialist systems. 

  • HVAC and services commissioning 
  • Test and certify 
  • Photography 
  • Handover and user training 
  • Operation & maintenance manual 

Contact

Unit 4 Windsor Park, London, SW19 2TJ



green-light.co.uk Contact Form
First Name*
Last Name*
Company*
Email*
Phone*
Details*
Lead Source
Service Required*